<< Click to Display Table of Contents >> Navigation: Diagnostics with CanEasy > Using existing BSKD7 projects with CanEasy |
This chapter describes, how CanEasy must be configured for the first usage with a BSKD7 project. Therefor three possibilities are described.
•Configure BSKD7 or CanEasy with BSKD as separate diagnostics tool
•Extend a CanEasy residual bus simulation or analysis configuration with an existing BSKD7 project
•Residual bus simulation and diagnose with two CanEasy instances
Configure (CanEasy with BSKD)
Assumption is, that only a BSKD7 project should be used for a communication with a control unit (without a residual bus simulation through CanEasy).
•Start CanEasy with a new workspace
•Add a new bus and select the used hardware interface and. Configure its setting like baud rate and HW channel
•Add the batch file, which will start your needed BSKD7 project via the tree entry BSK diagnostics 7. Set a meaningful name for the project if desired
•Start the simulation (F5) to establish the connection to the bus
•Start now the configured diagnostics project
Extend a CanEasy residual bus simulation or analysis configuration with an existing BSKD7 project (CanEasy with BSKD)
Assumption is, that an existing BSKD7 project should be added to a workspace with an already existing residual bus simulation or analysis configuration for the communication with a control unit.
•Start CanEasy
•Load the workspace with the existing residual bus simulation or analysis configuration
•Add the batch file, which will start your needed BSKD7 project via the tree entry BSK diagnostics 7. Set a meaningful name for the project if desired
•Start the simulation (F5) to establish the connection to the bus
•Start now the configured diagnostics project
Residual bus simulation and diagnostics with two CanEasy instances
Assumption is, that e.g. a residual bus simulation with CanEasy should be operate on a bus and with a further CanEasy a diagnostics project should work.
•Start CanEasy
•Load the workspace with the existing residual bus simulation or analysis configuration
•Start a further CanEasy (confirm the question if CanEasy should be started a second time)
•Add a new bus and select the used hardware interface. Configure its setting like baud rate and HW channel
•Add the batch file, which will start your needed BSKD7 project via the tree entry BSK diagnostics 7. Set a meaningful name for the project if desired
•Start the simulation (F5) to establish the connection to the bus
•Start now the configured diagnostics project
Note: |